BRIDGE STREET · 09 SEPT
Opening checks
9 steps
- Done: Alarm off, lights on06:04
- Done: Fridge 1 · 4.1 °C06:09
- Done: Fridge 2 · 3.8 °C06:11
- Done: Freezer · −19.2 °C06:12
- Done: Allergen board photographed06:21
+ 3 more · closed 06:41 by T. Brackley
A list, not a dashboard.
What the shift lead gets is the same list that was on the laminated sheet, in the same order, with the times they actually did each thing written next to them.
The run sheet for one site, one task, one morning.